Swing Door Supplier Wholesale: The Schedule Is the Order, Handing Has No Single Convention, and the Number That Moves the Price Is Doors Per Type, Not Doors

Date: Oct 11 2026 标签arcclick报错:缺少属性 aid 值。
What this page is and is not. It is written for buyers who are ordering swing doors in quantity, not one at a time. It contains no prices, no freight figures and no lead times, because those depend on your opening list and your port. What it does contain is the one document that decides whether a wholesale order arrives correct: the door schedule. Every number that appears here is either a published value from a named public source or an arithmetic example we have labelled as ours. Do not copy any of it into a purchase order without checking it against your own drawings and your own authority having jurisdiction.

Buy one swing door and a mistake is an installation problem. Buy two hundred and the very same mistake is a logistics problem. The leaf is still the same leaf, the hinge is still the same hinge, but the cost of being wrong has changed species: it is no longer measured in a carpenter's afternoon, it is measured in a container, a reinstallation programme and a set of handed locksets that nobody will take back.

Here is the sentence that the rest of this page explains. A wholesale order of windows is the same window many times. A wholesale order of swing doors is many different doors that happen to share a catalogue page. A window repeats. A swing door does not, because every opening asks the same leaf six separate questions and can answer each of them differently. Wholesale pricing is built on repetition, and the swing door is the product in the building that resists repetition hardest.

We should say early what we are and are not. ALPES builds aluminium system windows and doors: outward-opening casement windows, a side-press sliding window, tilt-and-turn, and thermal-break sliding doors. Our swing door category page exists but has no product on it. We are writing this anyway, and not as a bait piece, because the six questions in this article are the same six questions our own products have to answer. If you want a supplier who pretends to have every door type on the shelf, you will not have trouble finding one.

One word, five products, and only one of them is what you meant

Before wholesale even enters the conversation, the phrase itself has to be split. Search any market for a swing door and you will be offered, in no particular order, an architectural hinged door, a commercial kitchen traffic door, a shower screen, a closet leaf, a garage leaf and an automatic operator assembly. They are drawn by different people, bought by different people, and tested against different things. Some of them are not doors in the building-envelope sense at all.

The public sources are unusually blunt about this. One specialist door guide states plainly that a double-action swing door is a traffic door, not a fire, smoke, acoustic, thermal or hygienic airlock door, and that it does not seal. Another, writing for specifiers, notes that double-action doors open in both directions and self-centre, and that vision panels at eye level are standard practice and in many jurisdictions a code requirement in commercial kitchens and service areas. Neither of those sentences can be said about the front door of a house, and both of them are true about a commercial kitchen swing door.

Called a swing door What it actually has to do What it never does Who decides it
Architectural hinged door Close against a continuous gasket, latch, lock, sometimes hold a fire or smoke rating Does not move out of the way by itself, does not survive cart impact without protection Architect, door schedule, authority having jurisdiction
Double-acting traffic door Swing both ways, self-centre, take cart and trolley impact, give sightlines Does not seal. Is not a fire, smoke, acoustic or thermal door Food service operator, hygiene regime, local code if it sits on an egress route
Shower swing door Contain water at the threshold, use safety glass, stay clear of a wet floor Is not a security door, is not rated for the building envelope Glass standard and local wet-area rules
Closet, louver or bi-fold leaf Be light, be cheap, be repeatable across a whole floor of units Carries no envelope rating at all Joinery package, not the façade package
Automatic swing door with operator Open on demand, protect people in the swing arc, behave predictably on power loss Is not a door you can specify by leaf alone Powered-door safety standard, sensor layout, accessible route
Garage or industrial leaf Take wind, take abuse, sometimes take a vehicle Usually not a thermal or acoustic element Local wind and structural provisions

There is a useful trap hidden in the middle row. Traffic doors are widely assumed to be exempt from door code, and the published position is the opposite: the model codes do not specifically address them, but they do not specifically exempt them either, so a traffic door sitting on an accessible route or on a required means of egress is subject to the same door requirements as anything else. The published examples are specific: at least thirty-two inches of clear opening width, measured from the face of the door at the ninety-degree open position to the stop on the strike jamb; for a pair, at least one leaf must provide that width; and on an impact door the measurement is taken to the tear-drop bumper rather than the door face, because the bumper projects into the bottom thirty-four inches where projections are not allowed. A flush bottom surface is required on the push side up to ten inches from the floor. None of that appears on a catalogue page. All of it appears on a schedule.

The schedule is the order

One interior door manufacturer puts the whole problem in a single sentence: an incomplete schedule is the most common reason door quotations come back full of assumptions, and assumptions become site problems. That sentence is the reason a wholesale enquiry should never start with a quantity.

A door schedule is one row per opening, keyed to the tag on the floor plan. It is read by the contractor who prices it, by the door, frame and hardware suppliers who prepare submittals against it, and by whoever checks the life-safety plan. Publicly published templates converge on the same set of columns, and two things about that convergence matter. First, the schedule points out to other documents: door type elevations, head, jamb and sill details, and a numbered hardware set. Second, the hardware set column is meaningless unless a second sheet lists what each set contains, one item per row, so that the number always has something behind it.

Column What has to be stated Why the factory cannot guess it
Door number and location One unique identifier per opening, matching the plan tag It is the only thing that survives from drawing to crate to site to year five
Structural opening Width, height and wall thickness Frames are made for the wall, and no catalogue sells a wall
Leaf size and handing Single or pair; left or right; and the convention used Wrong handing means a new leaf, not an adjustment
Fire and smoke rating None, or a specific duration with its smoke class It sets the core, the seals, the glazing and every hardware item
Acoustic rating A number in decibels, or none It changes the leaf build, the perimeter seals and the threshold
Leaf construction and thickness Core type, facing, edge treatment, thickness Weight drives hinge count, closer size and, on a pair, the coordinator
Face finish A code, not a colour name Descriptions do not match across batches; codes can be re-ordered
Frame type and material Rebated, flush, concealed, metal; and its material It decides whether the frame goes in before or after plaster, which is a programme decision
Glazing or vision panel Size, glass type, and the rating of the glass Vision glass must be covered by the same evidence as the leaf
Hardware set A set number that points to a row-by-row list "Stainless steel ironmongery" is a sentence, not a set
Special functions Access control, hold open, panic exit, undercut, clear width These are the items that fail inspection, not the leaf
Quantity per type The count of identical doors Repetition lowers the unit price. Variety does not

Notice the last row. It is the row that wholesale buyers leave blank and it is the row that sets the price. Notice also the size row: a nominal call-out such as a 32x80 entry door is a name, not a dimension. On a properly built schedule the same opening produces three numbers: the structural opening in the wall, the leaf size, and the clear opening that the code actually measures. None of the three equals the call-out, and the one that goes on the purchase order is the leaf size in millimetres.

A door schedule you can paste into an enquiry

This is the deliverable. Copy it, one row per opening, and send it instead of a total count. Anything you leave blank becomes an assumption, and assumptions are the thing the manufacturer will quietly resolve in his own favour.

Line Field A good entry looks like Left blank, it becomes
1 Door number ____ (same tag as on the plan) Nothing on site can be traced to anything on the drawing
2 Location Level ____, room ____ The schedule cannot be read without the plan open beside it
3 Structural opening, width ____ mm A frame that does not fit the hole it was made for
4 Structural opening, height ____ mm Same, vertically
5 Wall build-up, outside to inside ____ / ____ / ____ / ____ mm A frame depth guessed from a single number
6 Single leaf or pair Single / Pair / Pair unequal One leaf quoted where two were drawn
7 Leaf size ____ x ____ mm A nominal call-out treated as a manufacturing dimension
8 Handing LH / RH / LHR / RHR A coin toss at the factory
9 Which convention that letter uses Viewed from ____ side, ____ standard Correct letter, opposite door
10 Swing Inward / Outward / Double-acting A leaf that opens onto the thing it was meant to clear
11 Fire and smoke Not rated / ____ minutes, smoke ____ A leaf that fails the inspection it was never specified against
12 Acoustic Not rated / ____ dB Perimeter seals chosen by habit rather than by target
13 Leaf build and thickness ____ core, ____ facing, ____ mm A weight nobody calculated, so hinges and closers sized by habit
14 Finish ____ code, batch ____ A colour that cannot be matched in year five
15 Frame type and material ____ Frames arriving in the wrong half of the programme
16 Glazing ____ glass, ____ mm, rated ____ A panel that voids the assembly's evidence
17 Hardware set number Set ____, functions ____ Mixed finishes and mixed functions across identical openings
18 Threshold ____ mm, ____ profile A step that appears only after the floor finish is down
19 Special functions ____ Access control and hold-open discovered after the leaves are machined
20 Quantity of identical doors ____ A price built on a total instead of on repetition

Handing: four letters, at least two conventions, one container

Handing is the variable that turns a wholesale order into a gamble, and it is worth saying why in one breath: every hardware component on the door is manufactured to match a specific hand. Hinges, locksets, closers and exit devices. Order the wrong hand and the hardware does not install correctly, and in some cases does not function at all.

The four designations are LH, RH, LHR and RHR. Beyond that, the published guidance diverges, and the divergence is the point rather than a footnote.

Public source type Where it tells you to stand What it calls the result
Commercial hardware distributor Outside of the door: the non-secure, public-facing or approach side Hinges left and swings away is LH; hinges left and swings toward you is LHR
Hardware exporter guide The pull side of the door Hinges right and pulls toward you is RH; hinges right and pushes away is RHR
Building explainer The secure side, or key side Hinges left, swings away, is LH
European door manufacturer The side the door opens toward, hinges visible Hinges left is a left-hand door

Read the middle two rows against each other. One says reverse means the leaf comes toward you; the other says reverse means it goes away from you. Both are published by people who sell door hardware for a living. The reason they disagree is that they start from different sides of the opening, and both are internally consistent. On top of that, published hardware guidance states outright that the North American system and the European DIN system are different, that the European left and right are always viewed from the pull side, and that for export projects you should specify the reference viewpoint, the standard used, and then send diagrams, a schedule and photographs.

That is why the schedule column is not "handing". It is handing plus the convention. One published schedule guide gets this exactly right and puts both in the same cell: left or right, and the convention used.

Four consequences follow, and they are the reason this section exists in an article about wholesale rather than in an article about hinges.

  • Handed hardware is not returnable. One hardware distributor states this without softening it: suppliers cannot accept returns on handed products because they cannot resell hardware configured for a specific application. At a quantity of one this is annoying. At a quantity of two hundred it is a line item you absorb.
  • A pair is not two of the same door. Published guidance is explicit: a double door pair typically includes one LH and one RH leaf when both swing away from the approach side, not two doors with identical handing. Assuming symmetry is named as one of the most common determination errors.
  • A pre-hung leaf cannot be reversed on site. On a pre-hung unit the hinge mortises and the latch bore are factory-cut to the specified handing. Order the wrong one and installing it correctly requires reworking frame components, not turning the leaf over.
  • The error is invisible until it is expensive. Wrong handing is routinely reported as one of the most common procurement errors in door hardware, and the published failure modes are not subtle: locksets installed backwards with the keying on the wrong face, closers mounted on a face that interferes with the swing, exit devices opening in the wrong direction.

"Grade 1" is six different tests on six different standards

Wholesale enquiries almost always contain the phrase "Grade 1 hardware". It is the least useful phrase in the document, for a reason that takes one table to explain: the grade is defined per component, against a different standard number, with a different cycle count, and the same grade on six components is six different test results.

Component Standard Grade 1 / Grade 2 / Grade 3 cycles, as one manufacturer publishes them What else that standard measures
Butt hinges A156.1 2,500,000 / 1,500,000 / 350,000 Load and wear on the knuckle, not appearance
Bored locks A156.2 1,000,000 / 400,000 / 200,000 Strength in torque and force, plus operational endurance
Mortise locks A156.13 1,000,000 / 800,000 / 800,000 A different body, a different preparation, a different pocket in the leaf
Door controls (closers) A156.4 2,000,000 / 1,000,000 / 500,000 Closing force, sweep and latch speed, backcheck
Exit devices A156.3 500,000 / 250,000 / 100,000 Egress function, not durability alone

Now the part that makes "Grade 1" unusable on its own. The table above is one manufacturer's published list. Other publishers give different figures for the same standard and grade: we found the Grade 1 cycle count for bored locks published as both one million and eight hundred thousand, and the Grade 1 figure for closers published as both two million and one and a half million. We are not going to adjudicate between them, and we are not quoting either as a specification. We are pointing at the disagreement, because it proves the rule: a grade without a standard number and an edition is an adjective.

The second half of the problem is the function number, and this is where wholesale orders actually go wrong. A commercial lever lock looks like one product; the two- or three-character function code on the order form decides how the door behaves. Published function lists include passage, where both levers are always free; privacy, lockable from inside with emergency release; entry, where a key locks or unlocks from outside and the inside lever is always free; classroom, where the outside lever can be locked in either position; storeroom, where the outside lever is always locked and the inside is always free for egress; and institutional, where both levers are keyed. Get the function wrong and the published consequence is blunt: returning and reordering a commercial lever lock that has already been installed typically costs more in labour than the hardware itself.

Two more things belong in the same breath. Fit is decided by three dimensions that have nothing to do with grade: backset, cross bore and door thickness, and published guidance notes that commercial locks generally do not ship with the adjustable latch that residential sets use. And grading should be applied per opening rather than per building; one published guide calls uniform grading across a building the specification error that costs the most, because nobody needs the heaviest grade on a linen closet and nobody should accept the lightest on a corridor leaf that opens a few hundred times a day.

The number that moves the price is doors per type, not doors

Go back to the last row of the schedule. Quantity per type is defined in published guidance as the count of identical doors, with the reason given in the same cell: repetition lowers the unit price. That single line explains more about wholesale quoting than any price table will.

Here is an arithmetic example, and we will label it clearly as ours rather than as anyone's published data. Take two hundred leaves on one project. In the first case they resolve into six types. In the second they resolve into forty. The total is the same, the nominal area is close to the same, and the second order is the more expensive one to make, for reasons that have nothing to do with material:

  • forty first articles instead of six, and the first leaf of a type is where the drawing, the sample, the set-up and the check all live;
  • forty handing decisions instead of six, each one a separate chance to be wrong, and each one unreturnable;
  • forty hardware sets to assemble, pick and keep together through packing;
  • and a packing list in which almost every line is a quantity of one, which is where wholesale logistics starts losing money quietly.

There is a second arithmetic hiding here, and it catches people who did the first one correctly. Minimums attach to a type or a finish, not to the order. One published interior door guide states that its lacquered door sets start from thirty doors. Ten types of three doors each may not reach the minimum for any one of them, even though the project comfortably clears thirty doors in total. Asking "what is your minimum" without asking "minimum of what" is how a wholesale buyer gets a quote that looks fine and arrives as three separate production runs.

One more sequencing trap belongs in this section because it is a schedule line that becomes a slab. Published guidance on double-action doors notes that floor springs must be cast into the slab, so they have to be decided before the floor is poured, and calls it a classic site-sequencing trap. That is a handing and hardware decision that has to be made before concrete, not before delivery.

Three failures that only exist at wholesale scale

Each of these is a small error at quantity one and a programme-level event at quantity two hundred. None of them is a manufacturing defect, which is exactly why they are the ones that recur.

The handing split nobody counted

Enquiries are usually sent as a total with an assumption that the split is roughly half and half. The building rarely is. The count per hand is a number that exists on the schedule and nowhere else, and it is discovered in the wrong order: not when the order is placed, but when the crates are opened against a floor plan. By then the handed hardware is non-returnable and the leaves are machined.

The set number that was never written down

Without a numbered hardware set, "stainless" and "heavy duty" are words that two suppliers can satisfy differently, and a project can end up with three finishes across openings that were meant to be identical. The remedy is unglamorous and universally recommended: a set number, and behind it a sheet listing each item on its own row. The number is what makes the column mean something.

The re-order cliff

Year five. Three leaves are damaged and need replacing. At that point the order can only be reproduced if three things were recorded at the time: the schedule line with the leaf size in millimetres, the handing with its convention, and the hardware set number. Without them you are not re-ordering a leaf, you are commissioning a door, and the cheapest part of the job becomes the most expensive one. This is the argument for treating the schedule as a deliverable of the order rather than as a step towards it.

Six variables that must be on the order and never appear on a catalogue page

Variable What the catalogue says What the order must say If it is blank
Size A nominal call-out Leaf width and height in millimetres, plus the structural opening Every dispute becomes a question about what the name meant
Handing "Left or right available" LH / RH / LHR / RHR, with the viewpoint and the standard Handed hardware that cannot be returned
Swing A rendering Inward, outward or double-acting, per opening A leaf that opens into the thing it was meant to clear
Hardware A brand name Set number, function codes, grade with the standard number, finish code A door that works and behaves wrongly
Threshold "Low threshold option" The height in millimetres, and the finished floor levels on both sides A step that appears after the floor is finished, and stays
Wall A frame depth The build-up, layer by layer, from outside to inside A frame measured against a wall that does not exist yet

What we build, and what we will tell you we do not build

Being straight about this is quicker than being vague. ALPES has products listed under casement window, sliding window, tilt-and-turn and sliding door. Our swing door, folding door, entry door, tilt-and-slide and sun room category pages exist, and they are empty. If your schedule has a 24 folding door line on it, we will say we do not have that product rather than quote you a sliding door as though it were the same thing.

That is not an exit from this article, because the six variables are not swing-door variables. They are opening variables, and our own catalogue has to answer most of them:

  • Which leaf moves. Our side-press sliding window is offered as one fixed plus one movable, or middle fixed with two sides movable. That is the handing decision of a sliding window, and it has to be written down per opening exactly as LH or RH does.
  • Which side the screen sits on. An inward-opening mesh sash is a second leaf with its own cycle count and its own reach. It changes what you touch every day and it has to be settled before machining.
  • Which handle. Where a handle option exists, it is a choice between a baseless ninety-degree handle and a side-mount handle, and it belongs on the order rather than in a note.
  • Frame wall width against the real wall. Our published frame wall widths run from ninety millimetres on the passive tilt-and-turn, through one hundred and sixteen on one casement series, one hundred and thirty on the side-press window, to one hundred and eighty-two on a three-track sliding door. That number is the depth of the frame into the wall; it is not the thickness of your wall, and the honest way to choose it is to send the build-up rather than a single figure.
  • Track height as a threshold decision. A low track at eight millimetres, a high track at forty-three, and a high-drop bottom track at forty-five with an optional eighty-five millimetre water barrier are three different relationships with the floor and with water. The outer track is designed to hold water; crossing the inner dam is what counts as a leak. This has to be settled while the slab is still a line on a drawing.
  • Capacity is not a maximum size. A published driving capacity exists for one sliding door series and a published load capacity for another, and they are not the same measurement, so putting them in one sorted column is the fastest way to misread a catalogue. Both are also quoted per sash and both depend on the glass, which means the number changes the moment the glass does.

What we publish, and what you still have to ask for

Item Published Why there is a gap
Profile alloy and state Yes, across the range It is the same across the range, so it is a floor, not a differentiator
Profile thickness A range per series The range is a list of what can be supplied, not a tolerance band for your order
Insulation strip material Yes The width in millimetres is the number that matters and it differs by series
Thermal value On some series only It is a system value on a reference configuration, not a value for your opening
Air, water and wind ratings Not published Without a declared class you cannot define non-compliance, so ask for the value and the standard
Hardware brand Yes, per series A brand is not a function code and not a grade
Hardware cycle count On one series It is a rig test on a component, not a service life for a door
Salt spray and shear results On one series They belong to the series that was tested and do not transfer to any other
Maximum sash size On some sliding series It is published against an assumed glass build; change the glass and it moves
Glass rebate Not published Sash thickness is a stack-up, not the opening that limits the glass. Ask for the section
Anchorage layout, drainage route, sash sequence Not published They are functions of your opening and your wall, not of our catalogue

Ten lines to send with the enquiry

Ask A useful answer contains Sounds reasonable, says nothing
Is this product in your current catalogue A series name, or a clear no "We can do all door types"
Which handing convention do you use The viewpoint and the standard named "Left or right, as required"
Can handed items be returned A written position before you order "We will work something out"
Hardware set, item by item One row per item, with function codes and grades "German hardware, grade one"
The standard behind each grade A number and an edition per component "Meets international standards"
Minimum quantity The number, and what it applies to: per type, per finish, per order "Small orders welcome"
Price per type, not per total A line per schedule type with its own quantity One blended unit rate for the whole building
Finish code and batch A code, and a commitment to record batch by door number "Same colour throughout"
How does the schedule become your order Every row mapped to a line, with the blanks flagged back to you "Send sizes and we will quote"
Re-order path in year five The records kept, and what you must send to reproduce one leaf "Spare parts available"

Questions buyers actually ask

Is wholesale just a lower price for the same door?

No. Wholesale changes which mistakes are available to you, and the price mechanism is repetition of identical units rather than total volume. Two orders of the same size can carry different unit prices simply because one has six types and the other has forty. That is why the schedule's last column exists.

Can I just say "left hand" and let the factory work it out?

You can, and it is one of the most reported procurement errors in door hardware. Published guidance disagrees on which side you stand on to determine the hand, and the North American and European systems are not the same. State the letter, the viewpoint and the standard, and send the plan.

Does "Grade 1 hardware" cover the whole door?

It covers one component tested against one standard. Hinges, bored locks, mortise locks, closers and exit devices each have their own standard number and their own cycle thresholds, and even the published thresholds differ between publishers. Ask for the standard number, the edition and the function codes.

Why does the supplier keep asking for the wall build-up?

Because frames are made for walls, and a single depth figure tells the factory nothing about what that depth is made of. Send the layers from outside to inside. It is also the only way to catch a frame depth that will not suit the wall before it is delivered rather than after.

We only need three replacement leaves. Why is this so slow?

Because a leaf can only be reproduced from records: the schedule line with the manufacturing size, the handing with its convention, and the hardware set number. If those were not kept, the job is a new door rather than a repeat of an old one. That is an argument for the schedule, not against the supplier.

Do you make swing doors?

Not at present. Our listed products are casement windows, a side-press sliding window, tilt-and-turn windows and thermal-break sliding doors, and our swing door, folding door and entry door categories are empty. We would rather tell you that than substitute something that does not do the same job.

The short version

  • Buy one swing door and a mistake is an installation problem. Buy two hundred and it is a logistics problem.
  • A wholesale order of windows is the same window many times. A wholesale order of swing doors is many different doors sharing a catalogue page.
  • Split the word first: a kitchen traffic door is a double-acting door that does not seal and is not a fire, smoke, acoustic or thermal door.
  • The schedule is the order. An incomplete schedule is the most common reason quotations come back full of assumptions.
  • Handing needs four letters, the viewpoint and the standard. Handed hardware is widely non-returnable, and a pair is one left plus one right, not two of the same.
  • "Grade 1" is five different tests on five different standards. Ask for the number and the edition.
  • Function codes decide how the door behaves. Getting one wrong after installation costs more in labour than the hardware.
  • The price moves with doors per type, not doors. The first leaf of a type is the expensive one.
  • Minimums attach to the type or the finish. Ask what the minimum is a minimum of.
  • Floor springs have to be decided before the slab is poured. So do thresholds.
  • Write down the finish code and the batch by door number, or year five will be a new colour.
  • We do not build swing doors. We do build the products that have to answer the same six questions.
One practical way to settle it. Before you ask anyone for a wholesale price, build the schedule. One row per opening, twenty columns, blanks and all. The blanks will tell you which decisions have not been made yet, and the last column will tell you which of those decisions is costing you money. That document is worth more than any unit rate quoted without it.