Quality inspection is not the moment a finished window gets a quick look before it is wrapped. It is a chain of checkpoints woven through cutting, joining, glazing, hardware fitting, finishing, and packing — each one built to catch a specific failure mode before the next layer of work buries it. If you are sourcing aluminum windows and doors, understanding that chain is what lets you tell a system manufacturer from a reseller with a catalogue.

This article walks through what a credible inspection process looks like on the factory side, what ALPES's published build facts mean when you read them as inspection evidence, and the checklist you should run the day your units arrive.

What quality inspection actually covers

Three distinct activities get bundled under one phrase, and they answer different questions:

  • In-process inspection — does each step on the line match the drawing before the next step starts?
  • Finished-product inspection — does the completed unit meet size, appearance, and function targets?
  • Incoming inspection (yours) — when the container is opened at site, does what arrived match what was approved?

A supplier can be strong at the first two and still leave you exposed at the third if the documents do not travel with the goods. Keep all three in view.

In-process checkpoints that separate a real line from a workshop

The order follows the build sequence, because each checkpoint catches the errors that step introduces.

Post-cut measurement

Every profile length is checked against the cut list. Mitre angles are verified so both faces of the cut meet the blade at the same angle. A piece outside tolerance is rejected rather than hoped into place during crimping — it will not close up later.

Squareness after assembly

Both diagonals of the frame are measured; equal diagonals confirm the frame is square within a tight tolerance the factory sets. Corner rigidity is checked by racking opposite corners — a properly joined frame feels rigid with no flex.

Glazing seal check

After glass is set and gaskets seated, a water check is run on the external face while the frame is held at a slight angle, and the interior face and glazing rebate are watched for penetration. This exposes gasket gaps, blocked drainage, and misplaced packers that visual inspection alone misses.

Hardware function cycling

Every moving part is operated through its full travel several times — sashes opened and closed, all locking points engaged, friction stays tested at several angles, sliding sashes run back and forth for smooth travel and secure interlock at close. Listen for scraping, feel for binding.

Final visual and protection

Before wrapping, every visible surface is checked for scratches, dents, sealant smears, and swarf contamination. Drainage weep holes are confirmed clear. Protective film is verified intact on surfaces exposed during transport and installation, and each unit is labelled with its opening reference and orientation so it is not installed upside down or in the wrong opening.

The exact thresholds above — how many cycles, how tight the diagonal tolerance — vary by shop. Ask the manufacturer for its own written QC standard rather than assuming one number fits every line.

Material intake — what gets verified before cutting

Inspection starts before the first cut, with the incoming materials.

  • Aluminum alloy and wall thickness. ALPES uses 6060-T66 profiles with wall thickness from 1.8 mm to 2.5 mm depending on series. The alloy grade and the measured wall thickness are the first things a documented intake check should record, because they govern stiffness and the corrosion baseline.
  • Thermal break strip. The polyamide strip is PA66GF25 in a multi-chamber configuration. Verify the strip material and the chamber count on the section drawing, since these drive the thermal number, not the visible frame width.
  • Hardware authenticity. ALPES fits ROTO and Winkhaus (both Germany), CMECH (Red Dot design award, 30,000-cycle tested), and Wehag (Germany). Genuine hardware is identified by the stamped marking and the supplied batch documentation — a point worth its own verification step rather than a line on a quote.
  • Insulated glass unit. The IGU is checked for edge seal integrity, correct cavity width, and cleanliness of the glass faces before glazing.

What ALPES's published build facts mean for inspection

As a tilt and turn window manufacturers with two production centers, ALPES publishes build details that double as inspection evidence you can ask to see:

  • Two production centers in Foshan and Zhaoqing, Guangdong, on a 100,000 m² manufacturing base — capacity and process control you can request a site audit or video walkthrough for.
  • Full glue-injection corner process and welded-corner sealing on the casement and tilt-turn lines, which is what gives the corners their rigidity and continuous seal rather than a mechanical clip alone.
  • Dual-matrix eight-layer sealing on the AW90 passive tilt-turn window, and four-sided continuous sealing on the TS130 side-press sliding window — count the seal lines on the section drawing and confirm they are continuous at the corners.
  • Published test evidence on AW90: 240-hour salt spray resistance, 5,000 N shear resistance, and 360° locking-point distribution. Treat these as evidence of material and joint performance to request in writing — not as a warranty term.
  • Thermal values are system values: K 1.3 on AW90, 1.6 on C120, 1.7 on C116. The sliding series (TS130, SL lines) do not publish a whole-window K value; ask for the figure calculated for your exact glass build rather than assuming one.

Your incoming inspection checklist

When the goods reach site, the inspection moves to your hands. Request these documents with the shipment:

  • The approved shop drawing with your own mm dimensions (not the factory's nominal size).
  • Batch and colour records, including the powder-coat batch number.
  • Any test reports the contract named (salt spray, shear, air/water/wind if specified).

Then run the physical checks:

  1. Dimensions vs the approved drawing in millimetres — measure the frame and the opening sash, not just the glass.
  2. Diagonals of each frame — they should match within the agreed tolerance.
  3. Colour match at the unit, not just the small chip — check under the same light you will live with.
  4. Glass condition — no edge chips, no fogging inside the cavity, no scratches on the visible face.
  5. Drainage weep holes clear and unobstructed.
  6. Hardware operates smoothly through full travel; locks engage their keeps without excessive force.
  7. Protective film intact; photograph the crates and the units before uncrating so any transit damage is documented at the moment of opening.

If you are planning a casement window replacement or ordering a glass sun room alongside the doors, run the same checklist on those units — the failure modes are the same even when the product name changes.

A note on what a factory can and cannot sign for: ALPES can supply material certificates, test evidence, and section drawings, and can confirm its own production process. It cannot act as the approving body for your project's local code compliance, and a test certificate attaches to the producing factory, not to the brand name. Confirm which signatures are yours before you rely on a number in a brochure.

Common defects and where they start

Knowing the usual failure points tells you what to look for:

Defect Typical root cause What good inspection catches
Gap at the mitre joint Dull blade, wrong angle, or poor clamping Full glue-injection corners remove the clip weakness, but the cut still has to be square
Weak or loose corner Low crimp pressure or swarf left in cavity Blow out swarf before crimping; verify diagonal equality afterwards
Water ingress through bottom rail Blocked weep hole from sealant overspill or packer over slot Confirm drainage path open; on sliding lines check valve or eave-style drainage intact
Swarf or sealant on visible faces Housekeeping failure Caught at final visual inspection before wrapping

Put these in your RFQ and inspection spec

Question Why it matters What a good answer contains
What is your written QC standard at each checkpoint? Tells you inspection is planned, not hoped A documented list of checks with acceptance limits
Can I see intake records for alloy grade and wall thickness? Confirms the profile is what was quoted 6060-T66, measured 1.8 to 2.5 mm per series
Which hardware brand and batch ships on my order? Separates genuine German hardware from look-alikes ROTO / Winkhaus / CMECH / Wehag with batch docs
What test evidence do you provide, and for which configuration? A number without its specimen is not a result Report names the exact series, size, and glass build
How are corners joined, and are seals continuous at corners? Corner is where leaks and flex start Glue-injection or welded corners; continuous seal lines
What documents travel with the goods? Without them, incoming inspection is blind Drawings in your mm, batch and colour records, test reports

Frequently asked questions

Does ALPES publish a warranty period in its build specs?

No fixed term is printed in the product specifications; ask for the written warranty document and read the exclusions. This article deliberately does not quote a number.

Are the thermal K values comparable across series?

They are system values for specific configurations: 1.3 (AW90), 1.6 (C120), 1.7 (C116). Sliding series do not publish a whole-window value; request the calculated figure for your glass.

How do I confirm the hardware is genuine?

Check the stamped marking and the batch documentation supplied with the order; specify the brand in the contract.

What should I measure on arrival?

Frame and sash dimensions against your approved mm drawing, diagonals, colour at the unit, glass condition, weep holes, and hardware function.

Can ALPES approve my project for local code?

No; code approval is the buyer's responsibility. The factory supplies evidence and drawings.

Why photograph before uncrating?

Transit damage is easiest to claim when the crate and unit are photographed at the moment of opening, before any handling.

Short version

  • Inspection is a chain of checkpoints, not one end-of-line glance.
  • Verify alloy, wall thickness, strip, and hardware at intake.
  • Read ALPES's published facts (two centers, glue-injection corners, eight-layer sealing, 240 h salt spray, 5,000 N shear) as evidence to request in writing.
  • Run your own incoming checklist in millimetres against the approved drawing.
  • Put the six questions above in your RFQ; the answer quality is the inspection.