Buying aluminum windows and doors for one house is a shopping decision. Buying them for a real estate development is a scheduling decision. The product is the same; the risk is multiplied by every unit, every floor, and every plot on the site. This guide is written for property developers, main contractors, and architects who specify window and door packages at scale and want the factory conversation to start from the right documents rather than a photograph of a showroom sample.

One house versus one development: the multiplier you cannot see on a sample

A single showroom unit tells you whether a profile looks right. It tells you nothing about what happens when that unit is repeated forty, four hundred, or four thousand times across a programme. Every choice — opening type, frame colour, glass make-up, handing, threshold height — is decided once in design and then copied onto every elevation. A good decision copied is a saving. A marginal decision copied is a fixed cost. A wrong decision copied is a defect programme, not a single defect.

That is why, across multi-unit schemes, windows, doors and the related envelope items are usually the first major packages a developer buys from a source factory: they are high in quantity, they repeat across every unit, they are specified by schedule and drawing rather than by taste, and they are the most expensive to correct precisely because by the time the error is visible the building is already closed in. The factory is not the last step in the supply chain; on a development it is the first constraint on the programme.

Why the openings package leads the procurement queue

On a multi-unit scheme the window and door package is normally the first major envelope item to be frozen, because almost everything else — cladding, internal partitions, mechanical penetrations, the sill detail — keys off the structural opening. Specifying early but loosely is worse than specifying late but tightly: a transposed dimension on a drawing that is repeated across forty plots becomes forty units of rework, not one. The discipline that protects a development is to treat the opening schedule as a controlled document, not a take-off that is finalised at bid time.

What a factory needs before it can quote — not a catalogue page

A price list tells you what a product costs in isolation. It does not tell you whether the product fits your drawing. Before a competent system-window factory can return a real number, it needs the documents that describe your building, not theirs. The minimum set:

  • Window and glazing schedule — opening reference, overall size, configuration (fixed, awening, casement, sliding, tilt-and-turn), glass make-up, frame system, colour.
  • Door schedule — opening reference, leaf size, handing, leaf construction, fire rating where the code calls for it, finish, frame type, hardware set reference.
  • Drawings — elevations, sections, and head, jamb and sill details, plus the wall build-ups the openings sit in.
  • Performance basis — the standard the destination market applies, the design wind pressure for the site, and the thermal and acoustic targets the envelope must meet.
  • Quantities — by building, by level, or by unit type, so the line items can be grouped and repeated correctly.
  • Programme — the dates the building is due to be closed in and the dates wet trades start, which decide when the frames must arrive.

Send the schedule and the drawing, and a competent supplier returns a priced line-by-line schedule against your own opening references — not a re-numbered price list — together with a queries list of the lines that cannot be quoted as written. That queries list is where most of the value sits: it is the factory reading your drawing harder than you did.

The failure mode is at the drawing stage, not at the factory

Most ordering errors on a development do not originate in the factory. They originate from a dimension that was assumed rather than measured, a wall thickness taken from the architect's intent rather than the built-up wall section, or a handing written at the wrong end of the schedule. The cheapest defence is to coordinate the architectural drawings with the manufacturing schedule and to sign off one sample plot first. One proven reference unit on site is far cheaper than discovering the error at plot thirty-nine.

The most expensive version of a drawing error is one that passes factory quality control and then fails on site. That is why a competent casement window contractor should be part of the sample-plot sign-off, rather than being brought in only when the programme is already slipping at plot forty.

Colour and finish are a batch problem, not a colour problem

Agree the finish early and keep the development to a single powder-coat run. A single finish across the whole scheme looks sharper and avoids the mismatched-batch problem that appears when different phases are painted in separate production windows. ALPES holds four standard finishes — Ice Cream White, Aurora Gray, Starry Sky Gray and Brown Coffee — with custom colour matching available, which means the colour decision can be locked at schematic design rather than discovered during snagging. If the scheme also includes entrance sets, put the entry door factory on a separate line of the schedule and insist on one powder-coat run across the entire development so the entrance and the windows read as one building.

Lead time is a programme input, not a logistics afterthought

On a phased development, release timing matters as much as unit price. Release too early and you pay to store a site's worth of frames; release too late and the glazing holds the entire programme. The practical pattern is a master purchase order against the total unit count, with phased releases tied to each phase's close-in or interior-trim dates, rather than dozens of individual orders. A factory that understands phased delivery is worth more to a developer than the same factory quoting a fraction lower on a single unit.

Who is actually buying — and what each role risks

Buyer roleWhat it optimisesWhat it most often gets wrongWhat to lock first
Developer / ownerWhole-project margin, programme, exit valueTreats the openings as a commodity line itemOne schedule, one colour run, sample-plot sign-off
Main contractorInstall sequence, snagging, programmeAssumes wall build-up instead of measuring itConfirmed wall build-up per opening before order
Architect / specifierAppearance, compliance, performanceWrites hardware by brand where the equivalent is unavailableConfiguration-locked spec, not brand-only spec
Property investorDurability across the portfolio, service costBuys on first cost, ignores repeatabilitySpare-parts policy and finish consistency

When you shortlist a casement window manufacturer, the question worth asking is not whether the first sample is good, but whether the four-hundredth unit is identical to the first. That is a factory-control question, not a showroom question, and it is the one that decides whether a development hands over clean.

What the factory gives you, and what stays with you

Be clear about the boundary before the contract is signed. A system-window factory supplies the manufactured units — profiles, glazing, hardware, finish, and its own documentation. It does not supply the perimeter seal and surrounding weatherproofing, which is an installation responsibility and the place where most envelope leaks are actually found. It does not hold your local product approval; in most markets the importer or developer is the certificate holder, and a test report covering one configuration does not cover a different glazing or hardware set. And it does not take on the building's energy compliance — the thermal target is a number your engineer commits to against the whole wall, not a sticker the factory puts on the box.

None of this reduces the value of buying from a source factory. It simply places the value where it belongs: in repeatable manufacture, documented performance, and a schedule that arrives when the programme needs it — not in a certificate that travels with the product.

What a development-grade package looks like in the ALPES range

ALPES manufactures on two production centres in Foshan and Zhaoqing, Guangdong, with a combined 100,000 square metre facility, and builds around 6060-T66 aluminum (wall thickness 1.8 to 2.5 mm) with PA66GF25 multi-chamber thermal breaks and German-system hardware from ROTO, Winkhaus, CMECH and Wehag. Across a development the relevant systems are:

SystemTypeProfileThermal KNotable for repeat-build
C120Outward casement6060-T66, 1.8-2.0 mm1.6119 mm frame wall, 62 mm sash, full glue-injection corners
C113Outward casement6060-T66, 1.8-2.0 mm—113 mm frame, 34 mm insulation strip, CMECH hardware tested to 30,000 cycles
C116Outward casement6060-T66, 1.8-2.0 mm1.7116 mm frame, 81 mm sash, 34-44 mm multi-chamber strip, 304 stainless hinges
AW90Tilt-and-turn / passive6060-T66, 1.8 mm1.390 mm frame wall, 360 degree locking, 8-layer sealing, Winkhaus hardware
TS130Side-press sliding window6060-T66, 1.8-2.0 mm—130 mm frame wall, ROTO 200 kg pulleys, 8-point lock, casement-level seal
SL155Thermal-break sliding door6060-T66, 2.2-2.5 mm—Four-track 155 mm, 400 kg 20-wheel, single sash 2800 x 2600 mm / 7.5 m2
SL112 / 167Heavy-duty sliding door6060-T66, 1.8-2.5 mm—112 / 167 mm, 220 kg driving, 45 mm drop + 85 mm barrier, 24A glass
SL126 / 182Thermal-break / lift-slide6060-T66, 2.0 mm (3.0 mm local)—126 / 182 mm, lift-slide 2500 x 3000 mm / 7 m2, 27A glass, 8 mm low or 43 mm high track
Honest gaps you must plan around. The sliding families above do not carry a published K-value; request the value for your exact configuration rather than assuming the casement numbers apply. The 240-hour salt-spray result and the 5,000 N shear figure belong to the AW90 tilt-and-turn system and do not transfer to the sliding series. Salt-spray hours describe the coating and pretreatment system, not the bare alloy. Treating these as if they were whole-range guarantees is the most common way a development specification goes wrong.

A paste-ready window and door schedule block

Copy this into the enquiry and fill one row per distinct opening. Empty cells are where the factory will send queries, so a blank here is a delay, not a silence.

FieldWhat to fillWhat happens if left blank
Opening referenceYour own tag per openingLine cannot be tracked against your drawings
Overall size (mm)Frame outer dimension, stated as frame or masonryFactory assumes; one wrong assumption repeats across the plot
Wall build-upLayer-by-layer from outside to insideWrong reveal, wrong anchor length, on-site rework
ConfigurationFixed / casement / sliding / tilt-turnQuoted against the wrong system
Glass make-upThickness, cavity, gas, laminateThermal and acoustic target not verifiable
Colour / finishExact finish call-outSplit batches across phases
Handing + conventionHanding and the convention usedWrong-handed units arrive and cannot be flipped
Hardware setLocking and handle referenceMixed ironmongery across the scheme
Quantities by unit typeCount per building or phaseNo phased-release plan possible
Performance basisStandard, wind pressure, thermal targetCompliance cannot be evidenced

What ALPES publishes versus what you must still request

ItemALPES publishesYou must still requestWhy the gap exists
Profile alloy and thickness6060-T66, 1.8-2.5 mmWall thickness for your exact seriesDepends on the series and local reinforcement
Casement / tilt-turn K-value1.3 / 1.6 / 1.7 (per system)K for your glazing and sizeA thermal value belongs to a tested configuration, not a name
Sliding-door K-valueNot publishedCalculated value per configurationSliding systems are sealed by contact, not compression
Coating durability240 h salt spray (AW90)Your climate exposure statementHours describe a test, not your site's life
Hardware cycles30,000 cycles (CMECH) quotedCycles for your hardware setBench cycles are not field service life
Local approvalFactory test reportsCertificate in your marketThe certificate holder is the importer or developer
Perimeter sealFactory-injected sash sealSite-applied weatherproofingInstallation is a separate contract from manufacture

Frequently asked questions

Do I need a different supplier for a hundred units than for ten?

The product can be the same; the documents must not be. At ten units a drawing error is annoying. At a hundred units the same error is a programme event. The supplier that earns the volume order is the one that returns a queries list and supports a sample-plot sign-off, not the one with the lowest single-unit price.

When should the openings package be frozen?

Early enough that the structural openings, lintels and sills are coordinated with the manufacturing schedule, but only after the wall build-up is confirmed. Freezing on intent rather than on the built-up section is the usual cause of on-site rework.

Can one colour run really matter across phases?

Yes. Powder-coat batches can read differently when painted in separate production windows. A single agreed finish, locked at schematic design and run across the whole development, removes that risk and usually simplifies the order.

Does a factory test report cover my project?

Only if your configuration — leaf or sash construction, frame, glazing and hardware as a set — matches the tested one. A report for a different hardware set or glass make-up does not carry over, which is exactly why the performance basis belongs in the schedule, not in a generic brochure.

What is the single most useful document to send first?

The window and door schedule plus the head, jamb and sill details. Those two items let a factory return a priced, line-by-line schedule and a queries list — the two things that turn a quote request into a buildable package.

Is the sliding family the wrong choice for a development?

Not at all; sliding systems are the workhorse of balcony and patio openings precisely because they repeat well. The only honest caveat is that the sliding families do not carry a published K-value, so the thermal figure must be requested for your exact glazing and size rather than borrowed from a casement system.

Short version

  • A development buys windows and doors by schedule and drawing, not by taste; the risk multiplies with every unit.
  • Freeze the openings package after the wall build-up is confirmed, then sign off one sample plot before the full release.
  • Send the schedule and the details; judge a supplier by the queries list it returns, not by a single-unit price.
  • Lock one colour run across the whole scheme and release against a master purchase order with phased deliveries.
  • Keep the boundary clear: the factory supplies the units and its documents; the perimeter seal, local approval and building energy compliance stay with you.
  • Use the ALPES casement, tilt-turn, side-press and sliding systems as a repeatable range, and request the sliding K-value per configuration rather than assuming it.