Read this before you copy any number out of it. Every dimension, hour and kilogram below belongs to a published source or to our own catalogue, and it is quoted to explain a mechanism, not to be pasted into a drawing, a specification or an order. Thresholds, code values and approvals belong to your authority having jurisdiction. Ask them in writing.
A project team will say "the designer" and everybody in the room will picture a different person. The architect hears the practice that drew the elevation. The contractor hears the supplier who will issue the fabrication drawings. The client hears whoever chose the colour. The factory hears a piece of software with the word in its product name. All four are right, and they are not talking about the same work.
That ambiguity would be harmless if the four jobs were sequential versions of each other. They are not. They are four different kinds of authority over four different things, and the thing none of them can do is the thing most buyers assume they are paying for.
The sentence this article is built on: you can design the windows of a building for your project. You cannot design a window section for your project. Both are called design. Only the first one is for sale.
A section is the shape of the metal when you cut through it and look at the cut end. Every chamber, every drainage path, every sealing groove, every screw boss, the depth of the glazing rebate, the width of the thermal break and the pocket that receives the lock are all decided in that shape. And that shape is made by a die, in a tool shop, for a profile range, before any of your openings existed. Once the die is cut, the section is finished. Everything that happens afterwards is selection.
This is not a complaint about the industry. It is the reason a window catalogue is not an options list. It is a constraints list, printed in the format of an options list, and handed to a designer who was trained to read options lists.
Below is the honest version of the word. The third column is the one that matters, because it tells you when that person stops being able to help you.
| Who is meant | What that person actually decides | When they lose their influence | What they cannot decide | Where you will find their name |
|---|---|---|---|---|
| The architect or building designer | Where the openings are, what they look like, what performance the building needs, and what the wall is made of | When the shop drawings are approved and the order is released | Anything inside the section: chamber layout, drainage route, rebate depth, hardware groove | Elevations, plans, the window schedule, the specification |
| The facade or building-enclosure consultant | Which performance classes and test standards apply, and how the interface to the wall is detailed | Once the performance brief is issued and the system is chosen | They do not manufacture or warrant the product, and they cannot sign a local approval | Performance specification, review comments, test witness reports |
| The system-house profile designer | The section itself: chambers, thermal break position, drainage, hardware pocket, glazing rebate | Years before your project, when the die was cut | They are not working on your building and never will be | Nowhere you will see, unless you ask for the section drawing |
| The fabrication or shop-drawing designer | How the elevation becomes cut lengths, hardware sets, drainage holes and a buildable window table | Once the drawings are approved and material is cut | They may not change the design intent; an unflagged departure is an unapproved change | Shop drawings, cut lists, hardware schedules |
| The industrial designer of the hardware | How a handle feels and looks; occasionally wins a design award for it | Long before your project | Nothing about the window it is fitted to | A badge in a supplier catalogue |
| The configurator called a designer | Nothing. It selects a product, a style and a size, then prices it | It never had any | It cannot measure your wall, and it does not carry code responsibility | A web form |
Read the third column downwards and the whole article appears in miniature: the people who can still change things are the people with the least knowledge of the section, and the person who knew the section best stopped being reachable years ago.
The word does more damage because it is attached to four nouns, and each noun belongs to somebody else.
| The term | Whose design it actually is | What it obliges | The mistake it invites |
|---|---|---|---|
| Design pressure | The building. Published guidance states that selecting window units begins with calculations by the project structural engineer or architect, using the wind-load method in the applicable load standard | A number the building imposes on the window | Asking a factory what the design pressure of your project is. It is not ours to give |
| Design award | A hardware brand's industrial designer, for a handle | Nothing about the window | Treating an award on a component as evidence about an assembly |
| Section design | The system house, at the time the die was cut | Everything the window can ever do | Believing a project can commission one |
| Design software | A vendor, for a factory's ordering process | Speed, and consistent repetition | Letting a default value stand in for a site measurement |
Only the first of those four is a designer's own work product, and it is a load, not a window. That is the whole confusion in a single line: the one thing in this industry that legitimately carries the designer's name is not part of the product.
This is where the word stops being a marketing problem and becomes a documented one. Several published regulatory instruments in China describe the split precisely, and they are unusually explicit about who draws what.
| Task | Who is named as responsible | What that means in practice |
|---|---|---|
| Elevation subdivision and opening design | The building design institute | The designer owns the layout of the holes, not the shape of the thing that fills them |
| Stating the key performance indicators | The building design institute, in the main design documents | Wind resistance, water tightness, air tightness, thermal, acoustic and operating-cycle durability must be written down by the designer, not discovered later in a catalogue |
| Window-specific detailing design (the deepening design) | The main design institute, or an enterprise with window design capability | When a non-main institute prepares it, the main institute must carry out a technical re-check and issue a written re-check record before it goes to drawing review |
| Review of specialist deepening-design documents | The original design institute, by seal and signature, and it is answerable for what it reviewed | The party that draws the fabrication detail is not the party that carries the review responsibility |
| Joint review before structural work starts | The developer convenes design, supervision, main contractor and the window manufacturer | A design-drawing review confirmation record is to be produced. This is the last moment a change is free |
| Public disclosure of the section | The developer, at the sales and construction site | Heat transfer coefficient, shading coefficient, the window section and any energy label are to be published. The section is treated as a public document, not as internal factory data |
Two lines in that table are worth more than the rest of this article. The first: the designer's named duties are subdivision and openings, plus writing the performance figures down. Not one word about the section. The second: the detailed fabrication design may be produced by the manufacturer, but the original design institute must seal it and is answerable for what it reviewed.
So the arrangement is not "the architect designs and the factory makes". It is: the factory details what the architect specified, and the architect signs for the detailing. One document, two authors, only one of whom can sign.
The last row is the one designers never ask about and should. If a local instrument in our own district requires the window section to be published alongside the thermal figures, then the section is not something a supplier may legitimately keep vague. You can ask for it, and you should ask for it early, because it is the only drawing in the whole package that shows the seven things described further down.
A custom aluminium section is not drawn into existence. It is extruded through a die, and the die is a block of tool steel that has to be designed, machined, heat-treated, nitrided, trialled and corrected. Published supplier guidance is consistent about the sequence and remarkably inconsistent about the clock.
| Stage | What has to be true before it starts | Published durations (one column per source, not reconciled) |
|---|---|---|
| Profile design and optimisation | Performance targets or preliminary drawings; wall-thickness uniformity, tongue ratios and corner radii reviewed for extrudability | One to two weeks for brief and drawing review; two to three weeks for cross-section modelling and structural analysis |
| Die design and manufacture | The cross-section is frozen. Frozen means frozen | Seven to eight days for sections under about 150 mm diagonal; twelve to seventeen days for 200 to 350 mm diagonal. Another source: seven to twelve days. Another: four to six weeks for simple shapes, up to twelve or more for multi-hollow dies |
| Trial extrusion and sample approval | The die exists and has run sample lengths | Trial lengths of roughly six to ten metres; at least one round of correction should be budgeted on complex hollow sections |
| Production extrusion and finishing | Sample signed off | Fifteen to eighteen days for extrusion plus surface treatment; twenty to twenty-five working days end to end in one published figure, ten to sixteen weeks in another |
| Economics that never change | Nothing | Tooling is a fixed upfront cost that does not scale with volume: the die costs the same whether it runs a few hundred kilograms or tens of tonnes. That is the origin of minimum order quantities |
We are not going to pick a number for you. The point is the spread: for the same activity, published sources differ by more than an order of magnitude, from under a fortnight to a full quarter. Any schedule that assumes a new section is a six-week activity and any schedule that assumes it is impossible are both reading somebody's marketing page.
What every source agrees on is the ordering, and the ordering is the argument. The section is finalised and frozen before tooling begins. There is no stage in that table at which a project team gets to adjust the chamber layout of the profile it just chose. There is a stage at which it can reject the profile and choose another one, which is a different act with a different verb.
If you want to know why the section cannot be redesigned late, look at how many jobs it is doing simultaneously. A published method for reading an aluminium frame cross-section walks from the outside face to the inside face through seven distinct zones. Not one of those zones appears on an elevation.
| Zone, outside to inside | The job it does | Visible on an elevation | If it was got wrong |
|---|---|---|---|
| Outer weather seal | Knocks the energy out of driven rain before it reaches deeper zones. It is not meant to be watertight | No | Everything behind it is asked to do a job it was not sized for |
| Outer face and drainage chamber | Pressure-equalised cavity; collects what gets past and drains it by gravity through concealed slots | No | Wind drives trapped water inwards instead of letting it fall out |
| Thermal break zone | Separates the two aluminium halves; its width, continuity and position govern the frame's thermal behaviour | No | Condensation on the room-side frame in winter, and a number that looks fine on glass but poor on the assembly |
| Inner face and reinforcement chambers | Accepts stiffening for wind deflection; carries the screw bosses that hardware is fixed into | No | Deflection under load, or fixings that pull out of thin metal |
| Hardware pocket | Receives the lock, cam or stay. Dimensioned separately because it must match the chosen hardware exactly | No | A pocket a millimetre too shallow and the lock tongue does not engage |
| Glazing rebate, bead and gaskets | Holds the sealed unit, seals it on both faces and allows it to expand | Only as a line | The glass you specified does not fit the rebate that exists |
| Interior trim channel | Conceals fixings and often doubles as a condensation gutter feeding the sill drainage path | Yes, as a shadow line | Winter moisture with nowhere to go |
Seven zones, one drawing, no elevation. A designer can move every one of those zones by moving to a different system; a designer cannot move one of them without moving all of them. That coupling is what makes the section a single decision rather than a list of preferences, and it is why "can you just move the drainage slot" is not a small request.
There is a moment where the architect's design and the factory's design have to be reconciled into one document. In most of the world that document is called a shop drawing, and the rules around it are unusually clear.
| Question | Design drawings | Shop drawings |
|---|---|---|
| What question does it answer | What needs to be built | How we will build it |
| Who produces it | Architect and consulting engineers | The party fabricating or supplying the element. Window and door schedules are routinely listed as an example |
| Who must approve it | Forms part of the contract documents | Reviewed by the engineer or architect of record before fabrication starts, commonly within five to fifteen business days |
| What happens when it changes something | Defines the outcome and sets the requirement | It interprets the design; it does not change it. A departure that is not flagged is not a valid interpretation, it is an unapproved change |
| What it is used for afterwards | Permit, contract, pricing | The agreed record of what was fabricated. Deviation from approved shop drawings sits with the subcontractor; error inside approved shop drawings needs a harder conversation about who it came from |
The sentence worth memorising is the one about interpretation. Shop drawings interpret the design. They do not change it. Much of the friction in this industry comes from a factory quietly resolving an impossible detail on your behalf, in a drawing nobody reads closely, and an architect signing a set that quietly no longer matches the elevation.
Published guidance on residential shop drawings names the same three failures repeatedly. They are worth printing because all three are cheap to prevent and none of them is about workmanship.
| The error | Why it survives review | The cheap prevention |
|---|---|---|
| Fabricating to architectural drawing dimensions without site measurement | The drawing is internally consistent, so nothing looks wrong on paper | Field-verify critical dimensions before final shop drawings, not after delivery |
| Coordination failure with adjacent elements | Each trade's own set is correct in isolation | One overlay drawing per opening, showing finishes, structure and services together |
| Revision control: shop drawings built from an earlier issue | The revision looks current because the title block was updated | Freeze a revision date and require every downstream document to name it |
None of these requires a better product. All three require somebody to own a date. In our experience the third one is the most expensive, because it produces a building full of windows that were correct on the day they were drawn.
Here is the part that no catalogue will tell you. We counted our own published parameters, from our own current product pages, and sorted them by who they serve. The count is ours, the numbers are ours, and you can repeat it on any supplier's table in twenty minutes.
| Group | Distinct published values, in millimetres | Count | Who it serves |
|---|---|---|---|
| Sash width, the visible band around the glass | 44.5, 53, 75, 96 | 4 | The elevation |
| Frame width, the outer visible band | 26, 36, 62 | 3 | The elevation |
| Mullion visible face, the second of the two numbers | 4, 21, 22, 31 | 4 | The elevation |
| Subtotal, appearance | Combined | 11 | What the building looks like |
| Frame wall width, depth into the reveal | 90, 112, 113, 116, 119, 126, 130, 155, 167, 182 | 10 | The wall, not the drawing |
| Glass sash thickness, a stack dimension | 43, 54.5, 55, 57, 62, 81, 90 | 7 | Nothing you can choose |
| Mullion depth, the first of the two numbers | 58, 72, 75 | 3 | Span and wind, not looks |
| Track height, including the raised water barrier | 8, 31, 43, 45, 53, 85 | 6 | Accessibility and weather, and almost never on an elevation |
| Profile wall thickness | 1.8, 2.0, 2.2, 2.5, 3.0 | 5 | Standard compliance and local reinforcement |
| Published thermal value, three series only | 1.3, 1.6, 1.7 | 3 | System values, not whole-window values for your opening |
| Load figures, which are not one measurement | 200, 220, 400 kilograms | 3 | Sash weight, pulley and drive capacity respectively |
| Subtotal, constraint | Combined | 37 | Whether the building stays dry, warm and operable |
Eleven numbers decide what people say about the building. Thirty-seven decide what the building does to the people inside it. Our own table prints them in the same columns, with no divider, and so does everybody else's.
This is not a claim that appearance is unimportant. It is a claim that the ratio is invisible, that the invisible ratio is not accidental, and that a designer who does not know the ratio will spend the design fee on the eleven.
Once you have split the columns, most specification arguments resolve themselves. Here is the same material reorganised the way a designer actually needs it.
| Published row | Input you can set, or constraint you accept | The trap in the wording |
|---|---|---|
| Opening method | Input, but only within what the series offers. A tilt-and-turn series is not a sliding series | Changing the opening method late usually means changing the series, which means changing the section, which means re-starting the submittal |
| Visible bands: sash width, frame width, mullion face | Input, from the eleven | The narrow number quoted in marketing is often the frame; the band your eye reads is usually the sash. Ask which one is being described |
| Colour and coating | Input, from four standard colours plus matching | Colour is a batch, not a name. On a phased project the batch rule matters more than the swatch |
| Frame wall width | Constraint unless you also own the wall. In new build you do; in renovation you do not | Depth is a series property, not a function of track count. A four-track series in our range is shallower than some three-track series |
| Glass sash thickness | Constraint. It is a stack dimension, not the glazing rebate | Never infer glass thickness from it. The rebate is a section drawing number, not a catalogue number |
| Mullion pair, for example 75 over 21 | First number is constraint, second is input | Anyone selling you on the second number alone has sold you nothing. The first number is the one that carries the span |
| Track height | Input, and the most consequential one that never reaches the elevation | A low track and a high water barrier are opposite answers. Decide it while the floor is still a line on a drawing |
| Load figures | Constraint, once glass is chosen | Three figures in our catalogue measure three different things. Sorting them into one descending column is the most common misreading of a sliding-door table |
Designers are often offered a glass upgrade as the answer to a thermal target. Published technical writing on thermally broken aluminium puts a blunt sentence on this: the glass did not change, the frame geometry did. replace the glass in a mediocre frame and you move one term; replace the frame and you move the assembly.
| Section-level decision | What published sources say about it | Can you change it for one project |
|---|---|---|
| Break width and continuity | Continuity matters as much as width: if the frame is broken but the threshold or coupling mullion bridges it, performance is lost where it is most vulnerable | No. Choose the system |
| The sill on a sliding system | A system with a thermally broken head and jamb but a highly conductive sill is not a balanced system, because the sill must carry rollers, manage water and take operational loads | No. This is exactly why the track-height row above is a design decision |
| Chamber proportioning | Several small chambers usually outperform one large open cavity because they limit internal air circulation; published guidance also cites a minimum chamber width to avoid convection | No |
| Isothermal alignment | Placing the polyamide bar on the same axis as the glass cavity creates a continuous isothermal surface. One of our own casement series states that the glass centreline, thermal break and equal-pressure seal sit on the same axis | No. It is already built into the section. That line in our catalogue is a report of a design decision, not an option |
| Hardware and fastener bridges | Screws, hinge plates, roller assemblies and fixing brackets can bypass the insulating break. Localised, but they add up around a frame | Partly: you can specify the hardware set and the fastener material, which is why they belong in the order, not on site |
| Glass build-up | Changes the sash weight, which interacts with load ratings, which interacts with the maximum panel size published for an assumed glass thickness | Yes, and this is the one lever that is genuinely yours. Use it knowing it moves two other numbers |
The pattern is consistent: five of the six rows are bought, one is chosen. A thermal conversation that starts with glass is starting at the only row where you have freedom, which is comfortable, and ignoring the five where the outcome was fixed before the meeting.
One more meaning of the word, because it is the one a buyer meets first. In this industry there is a configurator product literally named Window Designer. Its own description of what it does is the clearest definition of the word we have found: you select the product, you select the style, you select the size, and it will give you a price.
| What a configurator is good at | Where it stops, in the words of published guidance |
|---|---|
| Comparing ten or twenty units quickly and systematically | Where dimensions are uncertain, connection details are unresolved, or special installation conditions apply, no configurator replaces professional advice |
| Turning a choice into a price and a specification sheet | Software can produce performance data and check egress, but the designer remains responsible for confirming the product meets the local code |
| Keeping a repeated order consistent across a development | It works from what was configured for that business. It does not know your wall build-up unless somebody tells it |
| Speed of processing an order | A default value is a guess wearing a number. Published first-person accounts describe whole orders arriving too shallow because a default jamb depth was left in place for a deeper wall, and days lost building extension jambs on site |
The last row is the whole problem with treating a configurator as a designer. A configurator does not ask how thick your wall is. It assumes one. And the assumed value is often a plausible one from a different country's standard wall, which is the most dangerous kind of plausible.
Send us the wall build-up layer by layer, outside to inside, in millimetres. That single line prevents more rework than any other sentence in an enquiry, and no software will ask you for it.
Everything above converges on one practical instruction. These five are decided by different people on different days, and they behave as one decision.
| Number | Who usually owns it | What breaks if the others move first | Freeze it in writing by |
|---|---|---|---|
| Opening size in millimetres, stated as frame or as structural opening | Designer, from the structure | Every downstream number inherits the ambiguity | Before the window schedule is issued |
| Wall build-up, layer by layer, outside to inside | Designer, with the envelope consultant | Frame depth is chosen blind, and the interface detail is guessed | Before the series is selected |
| Glass build-up and the resulting sash weight | Designer, with the factory confirming | Load rating and maximum panel size were published for an assumed glass thickness | Before hardware is chosen |
| Track height and threshold condition | Designer, and it is a level decision as much as a product one | Accessibility or weather performance, and it cannot be corrected after the floor is poured | While the slab is still a line |
| Who signs the deepening design and who is first responder | Design institute and developer, on the record | A perfect product and a perfect installation, and nobody who will pick up the phone | Before the joint review meeting |
The credibility of everything above depends on this section being blunt, so here it is bluntly. The right-hand column is the part suppliers never print.
| We publish | What it actually is |
|---|---|
| A design award mentioned in one series | It belongs to a German hardware brand's handle. It is not our design and it is not the window's. It is the only place the word design appears in our catalogue, which is itself the point |
| One alloy and temper across every series | Because it is identical everywhere in our range, it cannot be the reason to choose one product over another. It is a floor, not a differentiator |
| Thermal values for three series | System values, not whole-window values, not calculated for your opening, and not transferable between series. Several series publish none |
| Isothermal alignment on one casement series | A description of a section that already exists. Useful as evidence, useless as a request |
| Two published durability figures on one series | They measure coating and substrate corrosion resistance, and composite bond strength. They are not air, water or wind ratings, and they do not transfer to other series |
| Two production centres | Ask which plant your order runs in. Colour batch, hardware platform and machining programme version can differ, and it is a reasonable question nobody asks |
And the honest list of what is not there:
If the section cannot be designed for you, then the value has to come from somewhere else, and it comes from how completely the configuration is described. This block is written to be pasted into an email. The third column is what happens when a line is left blank, and it is the column that matters.
| Line | A good answer looks like | Left blank, it becomes |
|---|---|---|
| Opening reference and count | One reference per distinct opening, with the number of each | A quotation priced on the average opening, which no project has |
| Size in millimetres, and which one it is | Width by height, labelled frame size or structural opening | A clearance assumption made twice, in opposite directions |
| Wall build-up, outside to inside | Every layer named, with thickness | A frame depth chosen against nobody's wall |
| Series and frame depth | Named, or explicitly left to the factory with the reason | Two bidders pricing two different products to the same description |
| Glass build-up, including spacer | Full make-up with spacer type, not a nominal thickness | A sash weight nobody calculated, against a rating nobody checked |
| Hardware platform and groove standard | Named brand and groove, with any optional platform noted | Two platforms with two different adjustment budgets, discovered in year three |
| Configuration, handing and the convention used | Which leaf moves, on which side, and whose left-and-right convention | Errors machined into the profile, which cannot be adjusted away on site |
| Track height and threshold condition | One of the published options, chosen against the finished floor level | An accessibility problem discovered at handover |
| Colour, and the batch rule | Colour name plus a written rule for phased deliveries | A replacement leaf in year five that does not match the wall |
| Performance figures the designer has written down | The values with the standard and the test configuration named | A supplier's marketing number where a specified value should be |
| Drawings required, and in what form | Section drawings, elevations and fabrication set, named up front | Discovery during the review period that half the package does not exist |
| Who signs the deepening design | A named entity, and who is the first responder after handover | A complete product, installed correctly, and a phone list |
A designer will hear these from every supplier, including competent ones. The right-hand column is the one to keep.
| What you are told | Why it carries no information | Ask instead |
|---|---|---|
| We can design it for you | Usually means selecting from an existing range. If it means a new section, ask about the die, the trial and the minimum quantity | Is this an existing die or a new one |
| It is fully customisable | Almost always means size and colour. Not chamber layout | Which rows on this table are inputs |
| German engineering | Describes a hardware brand or a design influence, not a place of manufacture or a performance level | Name the hardware set and the groove standard |
| The system is tested | A test report describes one specimen. Factory production control is what covers every unit | Does this configuration fall inside the tested specimen |
| Slim sightlines | Usually quotes the frame. The band you see is often the sash or the interlock | Give me frame, sash and mullion face separately |
| Heavy duty | An adjective until it is a number with a unit and a per-sash qualifier | Rated sash weight in kilograms, for this glass build-up |
| Meets international standards | There is no such single thing, and compliance is jurisdictional | Which standard, which version, which clause |
| Standard size | Standard to whose catalogue, and nominal or actual | Frame size in millimetres |
| Adjustable hardware | Everything is adjustable by some amount. The amount is the whole question | Published adjustment travel in millimetres, per direction |
| Spare parts available | Hardware is often cross-sourced. Profiles, gaskets and beads are not | Which parts ship in the original container, and which need our order number |
| We can | We cannot |
|---|---|
| Issue section drawings that show all seven zones, so the review is about facts rather than adjectives | Cut a die for one project's elevation at ordinary project volumes. The economics of tooling do not work that way, and we will say so early |
| Produce a fabrication set that interprets your design and flags every departure for approval | Carry the design responsibility or seal the deepening design in your jurisdiction |
| Name the hardware platform, groove standard and fastener material as separate order lines | Tell you the design pressure of your building. That comes from your engineer and your code |
| Hold one coating batch across a phased delivery and record batch numbers against opening references | Be the applicant for a local product approval, or transfer a test report to your project by assertion |
| Say plainly when a category in our catalogue is empty or a page is a placeholder | Substitute a sliding door where a swing door was specified, and call it equivalent |
| Confirm glass and sash weight against the published rating for your configuration | Guarantee a maximum panel size independently of the glass you choose |
Almost certainly not, and you should be suspicious of anyone who says yes quickly. A new section means a new die, a trial extrusion, at least one correction round and a minimum quantity denominated in hundreds of kilograms or tonnes of that one profile. What we can do is show you the sections that exist, explain what each one is already solving, and let you choose with your eyes open. The choice is real; the design is not.
Subdivision, visible bands, colour, opening method, glass build-up, threshold condition and the performance figures you write down. That is a substantial list, and it is where buildings are won or lost. It is just not the same list as the one that determines whether water gets out of the frame. When people ask what is a casement window, the answer changes with who is asking: to a designer it is an opening type with a swing path and a set of ratings to specify; to a factory it is a section, a hardware set and a cut list.
Because glass is the one row you can still change later, and the section is the row that was fixed years ago. Published technical writing puts it directly: the glass did not change, the frame geometry did. A thermally broken head and jamb with a conductive sill is not a balanced system, and no coating on the glass repairs that.
Read your contract and your local rules, not this article. What we can say is that published regulatory instruments in China place an explicit review duty on the original design institute: it must check whether the deepening design changes the original standard or the functional requirement, seal it, and answer for what it reviewed. That is why we flag every departure rather than quietly fixing it.
For comparing and pricing, yes. For anything where the opening is not yet settled, the interface is unresolved, or the wall is unusual, no. The failure mode is specific and worth naming: a default value for jamb depth, carried through a whole order, produces windows that are too shallow for the wall and a site team building extension jambs. Five seconds of measurement prevents two days of carpentry.
The section drawing, before the quotation. Not the brochure section with shading, the dimensional one. It shows the drainage route, the thermal break position, the hardware pocket and the glazing rebate, which are four of the seven zones and none of which appear on an elevation or in a price. If a supplier will not produce it, that tells you something earlier than any other question you could ask. Our completed project references and a custom sun room enquiry both start the same way, with the wall and the section.
One last boundary. Nothing here is a code interpretation, a structural calculation or an approval. Durations, dimensions and load figures are quoted from published supplier guidance and from our own catalogue, and the published sources disagree with each other by more than an order of magnitude on the one schedule question everybody asks. Take the mechanism, not the number. Ask your authority in writing, and ask your supplier for the drawing.